TopicDetails
Topic 1
  • Quality Inspection: It explains the configuration requirements of Quality Inspection.
Topic 2
  • Quality Improvement: It explains the configuration requirements of Quality Improvement.
Topic 3
  • Quality Management in Sales and Distribution: The topic describes the integration of QM with Sales and Distribution.
Topic 4
  • Quality Management in Manufacturing: This topic describes the processes related to implementing QM in Manufacturing.

 

NEW QUESTION # 56
When creating an operation step in an inspection plan , which of the following is mandatory?

  • A. Work centre
  • B. Control key
  • C. Standard text
  • D. Activity type

Answer: B


NEW QUESTION # 57
Which object must combined in test scheduling in the stability study Correct 3

  • A. Initial sample
  • B. Inspection plans
  • C. Physical samples
  • D. Strategy
  • E. Physical drawing procedure

Answer: B,C,D


NEW QUESTION # 58
Which settings are required for the immediate creation of inspection instruction during goods receipt process. Note : 3 correct answer

  • A. Control setting in characteristic of the task list
  • B. Inspection type settings in Material master
  • C. Settings for print control in implementation Guide (IMG)
  • D. Control setting in quality info record
  • E. Inspection type settings in the implementation guide (IMG)

Answer: A,C,E


NEW QUESTION # 59
By integrating the QM component in the production process, you can monitor and document process capability and the quality of products.
Which statistical and graphical tools does SAP provide to monitor a process ?

  • A. Statistical report charts
  • B. Quality management inspection data interface QM-ID
  • C. Statistical process controls (SPC)
  • D. Quality management information system

Answer: C


NEW QUESTION # 60
You want to use a purchasing process with release stages (for example, first-article, preliminary series, regular procurement) and different inspection plan: for each stage.How do you configure this process?

  • A. By assigning a status profile to the inspection type settings in customizing
  • B. By assigning a status profile to the inspection type settings in the material master
  • C. By assigning a status profile to the business partner
  • D. By assigning a status profile to the quality info record: Procurement

Answer: D


NEW QUESTION # 61
What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing.........

  • A. Usage of the class characteristics in the task list
  • B. Configuration settings
  • C. Settings for the inspection type activated in the material level
  • D. Master inspection characteristic linked to class characteristics

Answer: D


NEW QUESTION # 62
During results recording, you can create additional inspection characteristics for the inspection operation. Which characteristics can be used as additional inspection characteristics? Note: There are 2 correct answers to this question.

  • A. Master inspection characteristics as reference characteristic
  • B. Class characteristics from the classification system
  • C. Master inspection characteristics as incomplete copy model
  • D. Master inspection characteristics as complete copy model!

Answer: A,B


NEW QUESTION # 63
Which business object must you use to create a stability study?

  • A. Quality inspection lot
  • B. Sample drawing procedure
  • C. Quality notification
  • D. Physical sample

Answer: C


NEW QUESTION # 64
Which valuation mode can be used for a quantitative inspection characteristic?Note: There are 3 correct answers to this question.

  • A. Valuation according to characteristic attribute code
  • B. Attributive inspection nonconforming units
  • C. Mean value within tolerance range
  • D. Manual valuation
  • E. Attributive inspection number of defects

Answer: A,D,E


NEW QUESTION # 65
Your customer plan to use Test Equipment Management as part of QM.
What event triggers the creation of an inspection lot for calibration inspection?

  • A. Creation of maintenance order
  • B. Assignment of Equipment to a maintenance plan
  • C. Scheduling a maintenance plan
  • D. Release of a maintenance order

Answer: D


NEW QUESTION # 66
which copy model must user maintain in a Master inspection character to forbid changes in Inspection plan

  • A. Complete copy model
  • B. incomplete copy model
  • C. Reference characteristics
  • D. Inspection qualification

Answer: C


NEW QUESTION # 67
How does the system handle equipment and functional locations in an inspection lot in calibration inspection?

  • A. As a characteristic
  • B. As a material
  • C. As a inspection point
  • D. As physical sample

Answer: B


NEW QUESTION # 68
What causes the system to issue a message to prevent you from closing a notification?

  • A. Missing catalog profile
  • B. Missing complaint quantity
  • C. Open tasks
  • D. Open activities

Answer: C


NEW QUESTION # 69
when you plan an audit for which component can you define partners?(2 correct Ans)

  • A. Audit Question
  • B. CAPA
  • C. Question
  • D. Audit

Answer: B,D


NEW QUESTION # 70
When an inspection plan includes multiple group counter, what determines the unit of measure ?

  • A. Material master
  • B. Usage
  • C. lot size
  • D. Sampling procedure

Answer: B


NEW QUESTION # 71
After you create customer master records, you define second inspection related default specification in the ....
Which of the followings options can you use to control when the quality inspection take place (2 correct ans)

  • A. The inspection occurs after the release of the sales order
  • B. The inspection occurs after the good issue in posted
  • C. The inspection occurs after the transport order is quit.
  • D. The inspection occurs before the good issue in posted

Answer: B,D


NEW QUESTION # 72
Which inspection origin creates only unplanned physical samples?

  • A. 15 sample management
  • B. 16 stability study
  • C. 3 production
  • D. 2 goods issue

Answer: A


NEW QUESTION # 73
Which of the following physical sample categories can you create from a primary sample (2 correct ans )

  • A. drew sample
  • B. dip sample
  • C. mixed sample
  • D. pool sample
  • E. reserve sample

Answer: D,E


NEW QUESTION # 74
Where do you define the procedure for calculation of the quality score at usage decision?

  • A. Quality info record: Procurement
  • B. Procurement data in the quality management view of the material master
  • C. Usage decision code
  • D. Inspection type settings in the material master

Answer: D


NEW QUESTION # 75
When creating a process order, what type of task list is primary used for inspection ? Correct 3

  • A. Equipment
  • B. master recipe
  • C. Routings
  • D. Reference rate routing

Answer: B,C,D


NEW QUESTION # 76
Which partner role is available in a standard vendor notification

  • A. shipping point
  • B. sold to party
  • C. coordinator
  • D. work center

Answer: C


NEW QUESTION # 77
The quality inspector records defects in results recording for a material inspection. When creating notification the system determines the catalog profile by consulting objects in which of following sequences?

  • A. Notification Type - report type - Material
  • B. report type - Material - Notification Type
  • C. Material - Notification Type - report type
  • D. report type - Notification Type - Material

Answer: C


NEW QUESTION # 78
......