SAP E-S4CON-2505 Dumps - The Sure Way To Pass Exam [Q15-Q31]

Share

SAP E-S4CON-2505 Dumps - The Sure Way To Pass Exam

E-S4CON-2505 Exam Questions (Updated 2026) 100% Real Question Answers

NEW QUESTION # 15
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.

  • A. In DMO Migration Preparation
  • B. In SUM Parameters
  • C. In SUM Analysis
  • D. In Process Control Center

Answer: B,D


NEW QUESTION # 16
You are running an SAP ECC system .
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Use DMO for SUM.
  • B. Upgrade the SAP system.
  • C. Perform an SAP S/4HANA conversion without DMO.
  • D. Perform an SAP S/4HANA conversion including DMO.
  • E. Apply SAP Support Packages.

Answer: A,B,E


NEW QUESTION # 17
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. The errors from the SI checks must be solved; otherwise, SUM will report an error.
  • B. You need to build up an SI check framework by applying SAP Notes.
  • C. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
  • D. The Si checks are executed in the development system and the results are transported into the subsequent systems.

Answer: A,B


NEW QUESTION # 18
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.

  • A. Create new versions of the objects you need to adjust.
  • B. Manually activate the adjusted dictionary objects.
  • C. Release the transport request containing the modification adjustment.
  • D. Assign the transport request as a modification adjustment transport.

Answer: A,D


NEW QUESTION # 19
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the activation
  • B. To optimize the migration
  • C. To optimize the conversion
  • D. To optimize the main import

Answer: B


NEW QUESTION # 20
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running
  • B. SUM is still running in uptime; the 40 defined R3load processes are considered.
  • C. There are 40 R3load processes used for copying and 40 R3load processes for table count verification.
  • D. Without table contents comparison, only 40 R3load processes are being started.

Answer: A


NEW QUESTION # 21
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.

  • A. PARMVNT_UPG
  • B. TABIM_SHADOW_INC
  • C. TABIM UPG
  • D. PARDIST_SHD

Answer: A,C


NEW QUESTION # 22
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

  • A. Migration
  • B. Software update
  • C. Main import
  • D. Conversion

Answer: A,D


NEW QUESTION # 23
You are performing an in place SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?

  • A. The start of the business downtime
  • B. The start of the Execution roadmap step
  • C. The end of the business downtime
  • D. The end of the database migration

Answer: C


NEW QUESTION # 24
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Database migration
  • B. Custom code analysis
  • C. Software update
  • D. Unicode conversion

Answer: A,C


NEW QUESTION # 25
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.

  • A. MIGRATE_DT_DUR.XML file from a previous run
  • B. Stack XML file calculated by the maintenance planner
  • C. Breakpoint configuration file SAPUPPHAS.BRK
  • D. Parameter file SAPup_add.par

Answer: A,B


NEW QUESTION # 26
During a SUM run, you want to check if the PARCONV_UPG phase is still running property. Where can you find information about this? Note: There are 2 correct answers to this question.

  • A. Check for running R3load processes on the host where SUM is running
  • B. Check the running batch job via Job Overview (SM37).
  • C. Check the latest log files in the SUM directory, subdirectory a bap, subdirectory tmp.
  • D. Check for running R3trans processes on the host where SUM is running

Answer: B,C


NEW QUESTION # 27
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. SAP S/4HANA conversion including DMO
  • C. DMO without system update
  • D. SAP S/4HANA conversion without DMO
  • E. Benchmark tool

Answer: A,B,D


NEW QUESTION # 28
You want to use the Custom Code Migration Work list via remote code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?

  • A. Download it from the SAP Support Portal.
  • B. Configure it within transaction ATC.
  • C. Apply the corresponding SAAP Note via the Note Assistant.
  • D. Generate it by analyzing the specific custom code via RFC.

Answer: A


NEW QUESTION # 29
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?

  • A. After SUM has ended
  • B. During the Post processing roadmap step
  • C. Before the start of the SUM technical downtime
  • D. During the Preprocessing roadmap step

Answer: A


NEW QUESTION # 30
Which of the following scenarios does Software Update Manager cover? Note: There are 2 correct answers to this question

  • A. Conversion to SAP S/4HANAA on-premise
  • B. Conversion to SAP S/4HANAA Cloud Public Edition
  • C. Conversion to SAP S/4HANAA Cloud Private Edition
  • D. New Implementation

Answer: A


NEW QUESTION # 31
......

Pass SAP E-S4CON-2505 Exam Quickly With Lead2Passed: https://certblaster.lead2passed.com/SAP/E-S4CON-2505-practice-exam-dumps.html